
Maulvi Mohammad Zahir Zarkamar, head of rural development and reconstruction of the said province, told Bakhtar Agency that this project includes digging a well, building a reservoir and extending a pipeline with a length of 4,000 meters.
He says that clean drinking water has been provided to 180 families in the area through this network.
At the same time, the residents of the area are happy with the construction of the said network and say that with the construction of the said network, the existing problems in the field of drinking water will be solved.














